Recherche

Works On Prefectural And Community Roads In The Six (06) Administrative Regions

Avis d'appel d'offres

Des informations générales

Guinée
   ti:n? 0265/mtp/cab/dnrpc/2017
   Avr 29, 2017
   Mai 22, 2017
   Anglais
   Autre

Adresse de contact

   1st floor, Public Works Building BP 581 - Conakry
Guinée
   +224-628 33 63 83
   Cliquez ici

Marchandises, Travaux et Services

Travaux de construction de routes  

Texte original

      
Tenders are invited for Works on Prefectural and Community Roads in the Six (06) Administrative Regions (Boke, Kindia, Labe, Faranah, Kankan and N%zerekore). Lot 01: Construction of a 22-m Bridge; 1 = 6m H = 3.5m at Pk41 + 400 and a Bridge of 15ml 1 = 6m; H = 3.5m on the Faranah-yerewalia-kalanko-kabayakoro-kabayaba Road Axis in Faranah Prefecture for a Four (04) Month Implementation Period. Lot 02: Construction of Four (04) Bridges of 16 Ml, 17 Ml, 8 Ml and 21 Ml on the Road Rn21 Moribaya Center-gbalako-morigbeya-tenensidiya-diarabadou-mamoridou, in Kankan Prefecture for a Period of Eight (08) Months% Performance. Lot 03: Construction of a Bridge of 15 Ml and a Bridge of 30 Ml on the Road Carrefour Bourenf-kodasoulikouni-kounkou-kolita Oudoula, in the Prefecture of Siguiri for a Period of Seven (07) Month. Lot 04: Construction of the 30-m Bridge and 2.5 M High at Pk 4 + 800 on the Mossoko-darouleyfogohoun-fadiya-wouroubhe-sonden Prefecture Road (Rn 30) Rural District of Dialakoro, Dinguiraye Prefecture for One Five (05) Months. Lot 07: Construction of a Bridge of 12 Ml / 5.5 at Pk1 + 650 on the Rn1 Tabili-carrefour Guemebo Axis and a 15-m Bridge at Pk 21 + 800 on the Guemebo-fossikhoure-simithia Axis in the Prefecture of Kindia for a Period of Six (06) Months. Lot 08: Construction of Four Bridges of 10 Ml Each in Kindia Prefecture for a Seven (7) Month Implementation Period. - Construction of the Bridge of 10 Ml / 5.5 at Pk 7 + 600 on the Rn1 Axis Tabili-carrefour Guemebo; - Construction of the 10-m Bridge at Pk 9 + 550 on the Guemebo-fossikhoure-simithia Axis; - Construction of the 10-ml Bridge at Pk 20 + 150 on the Guemebo-fossikhoure-simithia Axis; - Construction of the Bridge of 10 Ml at Pk 30 + 000 on the Axis Guemebo-fossikhoure-simithia; Lot 09: Dismantling Project, Transfer and Erection of a Metallic Bridge Over the Diani River (62 Ml / 6.5 M) From the Zbela-bayana Road Network in the Rural Municipality of Zbela, Macenta Prefecture for a Period of Six (6) Months% Performance. Lot 10: Construction of the 14-m Bridge and 3 M High on the Nianou-soumah Road in Koubia Prefecture for a Four (4) Month Implementation Period. Lot 11: Construction of the 19-ml Bridge on the Hafia Road Lab-daara Lab Mosque With Construction of 2 Scuppers in the Prefecture of Lab for a Four (04) Month Implementation Period. Lot 12: Construction of a Bridge of 30 Ml and 12 Ml on the Rn1 Fissadou-kourala-damissakorodjelibakoro Rn6 Prefectural Road in the Prefecture of Kouroussa for a Seven (07) Month Execution May. Lot 13: Construction of a 30-m Reinforced Concrete Bridge and 7 M High on the Saala River on the Hinde-koula Mawoude Highway in the Hafia and Diari Rcs, Lab Prefecture for a Turnaround Time of Seven (07) Months. Lot 14: Construction of 4 Bridges of 10 Ml Each on the Carr Arfamoussaya-fadama-kolo-kalinkohamdallaye-sogoroya Road in Dabola Prefecture for a Seven (07) Month Implementation Period. Lot 15: Construction of a 12-m Reinforce

Related documents:

http://d.infostores.biz/T39138454.pdf?id=bWJpETl7eUAzJn9cUh9CdA9leTwcC2hiXBY=
Veuillez noter que cet avis est pour information seulement.
Nous nous efforçons de fournir des informations les plus exactes et mises à jour mais nous ne pouvons pas garantir que toutes les informations fournies sur notre site ne contiennent pas d'erreur.
Si vous avez des suggestions/corrections pour cet avis, n'hésitez pas à nous en informer.