Recherche

Rehabilitation And Construction Work On Prefectural And Community Roads In The Seven (07) Administrative Regions (boke, Kindia, Mamou, Labe, Faranah, Kankan And N%zerekore)

Avis d'appel d'offres

Des informations générales

Guinée
   ti:n? 0266/mtp/cab/dnrpc/2017
   Avr 29, 2017
   Mai 22, 2017
   Anglais
   Autre

Adresse de contact

   Direction national community and prefectural roads, Boulevard of Commerce, 1 st floor,. Public Works Building BP 581
Guinée
   +224-628 33 63 83

Marchandises, Travaux et Services

Travaux de construction de routes  

Texte original

      
Tenders are invited for Rehabilitation and construction work on prefectural and community roads in the seven (07) administrative regions (boke, kindia, mamou, labe, faranah, kankan and n%zerekore) Lot 01: Rehabilitation of the Sananfara-Wondfodya-Kansat (Diguilin) crossroads 24 km and the construction of 27 scuppers in Dabola prefecture for a five (05) month implementation period. Lot 02: rehabilitation of road sections in the prefecture of Dabola for a period of seven (07) months: - RN1 N%Dema Konindou-Banko-Kebeya-Banankelen, 60 km long; - Banko-Cissela along 18,400 Km Lot 03: rehabilitation of the Faranah-Yerewalia-Kalanko-Kabayakoro-Kabayaba road (41,900 km) and construction of a bridge of 20 ml l = 6m and h = 4m at PK33 + 900 in Faranah prefecture for a period of Execution of Eight (08) months. Lot 04: rehabilitation of the community road Carrefour Senkefra-Thigneido-Soumankoi-GbrkoPopoko-Diafra-Laako-Madina-Moussaya-Kobiko (42 km) in the prefecture of Kankan for a period of four (04) months. Lot 05: rehabilitation of the road RN21 Moribaya center-Gbalako-Morigbeya-Tenensidiya-DiarabadouMamoridou (71.3Km) in Kankan prefecture for a five (05) month implementation period. Lot 06: rehabilitation of the Kintinian-Maleah-Siguirini prefectural road (90 km long), in the prefecture of Siguiri for a seven (07) month implementation period. Lot 07: rehabilitation of the Franwalia-Nabou Community Road (40 km) and the construction of a bridge of 30 ml l = 6 m and h = 8 m at PK16 + 350 in Siguiri prefecture for a turnaround time of eight 08) months. Lot 08: rehabilitation of the Kigneko-Borifigna-Sokourakoro-Bagb-Kandaya-MaramoriyaKoumbakoura-Koumba-Carrefour road RN6 (Kissidougou-Kankan) Prefecture of 72.1 km in the CRs of Banfl and Koumba in the prefecture of Kouroussa for A period of seven (07) months. Lot 09: Construction work on a bridge of 15 ml and 4 m high on the road RN1 (Yirikiri crossroads) -Yirikiri-Yara-Doura on PK27 + 500 on the BOO waterway in the Sub-prefecture Of Doura, prefecture of Kouroussa for a period of execution of four (04) months. Lot 10: rehabilitation of the prefectural road RN27 Carref. Selouma (RN30) -Kalinko Bac (50 Km) in the sub-prefecture of Kalinko, prefecture of Dinguiraye for a period of five (05) months. Lot 11: rehabilitation of the road RN6 Djelibakoro-Damissakoro-Kourala-Fissadou RN1 70 km and construction of a 12-m bridge in the prefecture of Siguiri-Kouroussa for a seven (07) month implementation period. Lot 12: rehabilitation of the road Makaferedou-Lero-Soromayah-Karako 34km and the construction of six (6) puts of 20m1, 30m1, 12m1, 8m1 and two (2) bridges of 15ml each in the prefecture of Krouan for one Eight (08) months. Lot 13: rehabilitation of the Kondianakoro-Sidikila crossroads road (20 km) and the construction of a bridge of 15ml over 5m height at PK 0 + 600 on the Kaman-Sidikila road (Kobalen stream) in The Mandiana Prefecture for a six (06) month impleme

Related documents:

http://d.infostores.biz/T39138458.pdf?id=NzhoEGUnJRw/KnlaAUxBdwlvLmtMW29lVB4=
Veuillez noter que cet avis est pour information seulement.
Nous nous efforçons de fournir des informations les plus exactes et mises à jour mais nous ne pouvons pas garantir que toutes les informations fournies sur notre site ne contiennent pas d'erreur.
Si vous avez des suggestions/corrections pour cet avis, n'hésitez pas à nous en informer.