Contract Notice – Sector Directive, Standard Regulation Open Procedure (Construction Work) Renewal Of Switch 235 Hessenschanze - Civil Engineering And Track Constructioncivil And Track Construction Workrenewal Of Switch 235 Hessenschanze - Civil And Track Constructionhessenschanze Switch 235 (Approx. Dimensions): 55 M² ... Morerenewal Of Switch 235 Hessenschanze - Civil Engineering And Track Constructioncivil And Track Construction Workrenewal Of Switch 235 Hessenschanze - Civil Engineering And Track Constructionhessenschanze Switch 235 (Approx. Dimensions): 55 M² Expansion Of Pavement 60 M² Expansion Of Water-Bound Ceiling 45 M² Installation Of Water-Bound Ceiling 100 M² Expansion Of Asphalt 170 M² Installation Of Asphalt 75 M³ Take Up Road Demolition Material 35 M³ Installation Of Gravel Base Layer 25 M³ Bit. Base Layer As Track Support 1 Pc Installation Of Rail Drainage Boxes 1 Pc Produce Foundations For Lsa 1 Pc Installation Of Cable Shaft Lay 100 M Of Empty Cable Pipes 24 M Produce Grooved Track 1 Pc Manufacture Groove Switch Refilling Work In Summer 2027
Avis d'appel d'offres
Nous nous efforçons de fournir des informations les plus exactes et mises à jour mais nous ne pouvons pas garantir que toutes les informations fournies sur notre site ne contiennent pas d'erreur.
Si vous avez des suggestions/corrections pour cet avis, n'hésitez pas à nous en informer.
