Overhaul of heating lines within the district in connection with the transformation of the existing heating station No. 1 in the district 2935A, fed from the Baku Thermal Electric Center, into a modern type boiler house. Dismantling of the cover and foundations: asphalt concrete, with the help of breaker hammers, excavation of the soil with excavators with a capacity of 0.5 (0.5-0.63) m3 of Chalovu by loading it into dump trucks, soil group: 1 Depth Manual digging of soil in sloping trenches up to 2 m without fasteners, soil group: 1 Excavation of soil with excavators with a bucket capacity of 0.5 (0.5-0.63) m3 by loading onto dump trucks, soil group: 1 Dump truck, 20 t transport distance - 10 km. 1st class load. Making the foundation under pipelines: from sand