Recherche

Construction Of 03 Nos. Limited Height Subways (Lhss) Of Size 1 X5.0X5.0 M Rcc Box At Km. 158.794 (Shifted Location) In Lieu Of Lc No. C-130 At Km. 158.669, At Km. 156.530 (Shifted Location) In Lieu Of Lc No. C-129 At Km. 156.800 Between Bathinda Cantt. &Amp Bhuchchu Railway Stations And At Km. 148.808 (Shifted Location) In Lieu Of Lc No. C-124 At Km. 149.158 Between Lehra Mohabbat Railway Stations On Bathinda-Dhuri Section Of Ambala Division By Normal Pushing Method Using Protection Plate Ar

Avis d'appel d'offres

Des informations générales

   Juin 17, 2026
   Anglais
   Autre
   publié: Juin 17, 2026

Texte original

1122.
16-Jun-2026 06:23 PM
08-Jul-2026 03:00 PM
08-Jul-2026 03:00 PM
Construction of 03 Nos. Limited Height Subways (LHSs) of size 1 x5.0x5.0 M RCC Box at Km. 158.794 (Shifted location) in lieu of LC No. C-130 at Km. 158.669, at Km. 156.530 (Shifted location) in lieu of LC No. C-129 at Km. 156.800 between Bathinda Cantt. & Bhuchchu Railway Stations and at Km. 148.808 (Shifted location)...
Options d'abonnement

Basic

Full

Corporate

$550/year

$1000/year

Price on request

Buy Buy Contactez nous
Veuillez noter que cet avis est pour information seulement.
Nous nous efforçons de fournir des informations les plus exactes et mises à jour mais nous ne pouvons pas garantir que toutes les informations fournies sur notre site ne contiennent pas d'erreur.
Si vous avez des suggestions/corrections pour cet avis, n'hésitez pas à nous en informer.