Recherche

These Actions Are Defined In Detail And Precision In The Construction Project "Emergency Plan Implementation Project At The Foix Dam, In The Municipalities Of Castellet I La Gornal I Cubelles, Key: Lab.00705/01.P" , And Consist, Basically, In The Implementation Of Warning Systems To The Affected Population In The Event Of A Dam Breach Through A Set Of Sirens With All Their Facilities, Equipment And Communication Systems, Located In Specific Locations Such That Acoustic Coverage In The Affected Areas. Likewise, A Series Of Works To Adapt Existing Constructions, Buildings And Facilities Are Included In Order To Have An Emergency Management Center At The Dam With All The Necessary Equipment And Supplies. The Technical Details Of The Work Are Precisely Defined In The Corresponding Construction Project.

Avis d'appel d'offres

Des informations générales

   Oct 3, 2024
   Espagnol
   Autre
525014 EUR
   publié: Oct 3, 2024

Texte original

CTN2400345Aquestes actuacions es troben definides amb detall i precisió en el projecte constructiu “Projecte d’implantació del pla d’emergències a la presa de Foix, als termes municipals de Castellet i la Gornal i Cubelles, clau: LAB.00705/01.P”, i consisteixen, bàsicament en la implantació dels sistemes d’avís a la població afectada en cas de trencament de la presa mitjançant un conjunt de...
Options d'abonnement

Basic

Full

Corporate

$550/year

$1000/year

Price on request

Buy Buy Contactez nous
Veuillez noter que cet avis est pour information seulement.
Nous nous efforçons de fournir des informations les plus exactes et mises à jour mais nous ne pouvons pas garantir que toutes les informations fournies sur notre site ne contiennent pas d'erreur.
Si vous avez des suggestions/corrections pour cet avis, n'hésitez pas à nous en informer.