Recherche

Design Check and Works Supervision of the Reinforcement and Extension of the Bulk Water Supply System, the Water Distribution Network and Household Connections at the East Side of Menongue city (EXPIRED)

Sollicitation de Manifestations d'Intérêt

Des informations générales

Angola
   13CS1/MENONGUE/R/24
   Nov 25, 2024
Dec 10, 2024
  
ANGOLA - MINISTRY OF ENERGY AND WATER (MINEA)
   The Consultant shall be a reputable Civil Engineering Consultancy firm with core business public water supply engineering. The Consultant should be fully conversant with World Bank procurement documents and construction of projects in developing countries. The Consultant shall be a reputable Civil Engineering Consultancy firm with the following qualifications:
1. At least 10 years´ experience in water engineering (10 years’ experience in Water Supply Design Projects, including at least two projects dedicated to bulk water supply systems + 10 years’ experience in Water Supply Projects Works Supervision including at least two projects dedicated to bulk water supply systems);
2. At least 10 years´ experience in water engineering (10 years’ experience in Water Supply Design Projects, including at least two projects dedicated to water distribution networks and 1 project dedicated to bulk water supply systems + 10 years’ experience in Water Supply Projects Works Supervision including at least two projects dedicated to water distribution networks);
3. Demonstrated experience in carrying out similar assignments (experience in public bulk water supply systems and distribution networks);
4. Demonstrated experience in carrying out similar assignments (experience in water distribution networks, implemented in similar field conditions peri-urban areas of developing countries– applies mainly to supervision );
5. Pool of experienced field managers, designers, supervisors as well as backstop office staff to provide project management support to the field staff.
6. The consultant has carried out 3 similar, internationally financed projects,
7. Experience with World Bank procurement documents;
8. Experience with FIDIC Conditions of Contract;
9. Experience in construction projects in sub-Saharan developing countries;
10. Experience in Environmental and Social Management Frameworks and Resettlement Policy Frameworks – ESMF/RPF, specifically with ESMP and HSP;
11. Existence of a certified quality management system.
   Anglais
   Acquisition nationale
   publié: Nov 25, 2024

Adresse de contact

   Elsa Ramos
Project Director
National Directorate of Water
Rua Via S8, Condomínio DOLCE VITA, Edifício A1, 3º andar, Talatona, Luanda, Angola
Luanda
Angola
   +244 923 790 138 /+244 923 790 154
   Cliquez ici

Missions

Services de conduite des travaux Canalisations d'eau

Additional resources

Texte original

Veuillez noter que cet avis est pour information seulement.
Nous nous efforçons de fournir des informations les plus exactes et mises à jour mais nous ne pouvons pas garantir que toutes les informations fournies sur notre site ne contiennent pas d'erreur.
Si vous avez des suggestions/corrections pour cet avis, n'hésitez pas à nous en informer.