Recherche

HYDROGEOLOGICAL STUDIES IN CAHAMA AND OMPUPA FORMATIONS AND MESOCENOZOIC SEDIMENTS (EXPIRED)

Sollicitation de Manifestations d'Intérêt

Des informations générales

Angola
   28CS2/CAHAMA/UCP/R/24
   Jan 31, 2025
Fév 21, 2025
  
ANGOLA - MINISTRY OF ENERGY AND WATER (MINEA)
   The Consultant shall be a reputable Engineering Consultancy firm with:

- 20 years´ experience in water resources projects.
- At least three hydrogeological studies, including geophysical surveys, during the last 15 years.
- At least one water resources basin management plan, with groundwater flow from aquifers.
-Working experience with projects in developing countries.

It will be an advantage:
- ISO certification
- Experience in Angola
- Working experience with World Bank procurement documents,
- Working experience with FIDIC Conditions of Contract.
   Anglais
   Acquisition internationale
   publié: Jan 31, 2025

Adresse de contact

   Elsa Ramos
Project Director
National Directorate of Water
Rua Via S8, Condomínio DOLCE VITA, Edifício A1, 3º andar, Talatona, Luanda, Angola
Luanda
Angola
   +244 923 790 138 /+244 923 790 154
   Cliquez ici

Missions

Études de faisabilité, service de conseil, analyse

Additional resources

Texte original

Veuillez noter que cet avis est pour information seulement.
Nous nous efforçons de fournir des informations les plus exactes et mises à jour mais nous ne pouvons pas garantir que toutes les informations fournies sur notre site ne contiennent pas d'erreur.
Si vous avez des suggestions/corrections pour cet avis, n'hésitez pas à nous en informer.